post-template-default,single,single-post,postid-724,single-format-standard,bridge-core-2.0.5,qode-quick-links-1.0,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode-title-hidden,qode_grid_1300,side_area_uncovered_from_content,qode-theme-ver-19.8,qode-theme-bridge,disabled_footer_top,disabled_footer_bottom,qode_header_in_grid,wpb-js-composer js-comp-ver-6.1,vc_responsive,elementor-default,elementor-kit-

Carriage House Renovation – Week 5

The new steel structure is now going in! As the weeks continue, the GC will replace the old wood joists with steel beams and C-joists, moving from the center of the building moving outwards to keep the masonry walls stable and braced during the process.