Neuhaus Design | Architecture P.C | Carriage House Renovation – Week 2
719
post-template-default,single,single-post,postid-719,single-format-standard,qode-quick-links-1.0,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode-title-hidden,qode_grid_1300,side_area_uncovered_from_content,qode-child-theme-ver-1.0.0,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive

Carriage House Renovation – Week 2

Demolition has begun! All interior partitions of the existing floors have been removed, leaving behind one large open second floor.