Carriage House Renovation – Week 10

We now have the beginnings of a new third floor underway! The sub-floor has also been laid down for the rear-half of the building. As you can see, things are really moving.

 

view from the second floor looking towards the rear – you can see part of the temporary roof above the third floor framing

looking up at the third floor framing to see the cross joist bracing and subfloor

the front of the building is on the left – what you see here is the temporary roof dropping down from the right on what’s left of the existing roof on the left, with a temporary downspout in place to carry the rerouted rainfall out through the building