Carriage House Renovation – Week 7

Progressing forward with the new structural steel! C-joists are going in on the rear half of the second floor, with preparations being made for the new third floor.

 

fuzzy image – if you look close you can see the old wood joists being use to brace the masonry walls while the new steel floor joists go into place below

same view looking towards the rear from the first floor

joist pockets being carved out of the masonry wall in preparation for the new third floor – original wood roof joists can still be seen above